Match bank statements to payments
Statement files from the bank's SFTP server matched against the payments booked in finance, and the lines the bank has that the books don't.
- Team
- Finance
- Typed by
- Group controller
- Works with
- Bank SFTP, Finance (SQL Server)
- Delivers
- The unmatched lines and what to do with each
The request, as typed
Read last week's bank statements for company 1100 from the bank SFTP and match them against the payments in Finance. What does the bank have that we don't?

What it did.
Nothing to approve: every connector it used was read-only.
- 1
Listed the company's folder on the bank's SFTP server and fetched last week's three statement files.
- 2
Read the Finance payments and the company's bank accounts.
- 3
Matched every bank line on date, amount and account.
What came back.
Two of three bank lines have no payment in Finance: a €14,293 transfer from Sable Textiles with no record at all — the one to chase — and a €33 account fee, which normally goes to the journal rather than to payments.
Every screen is a capture of seib Cowork 0.2.5 running the request shown with seib-1, the real model, with no step scripted. The systems and documents are seib’s test environment: two fictional companies, Nordhafen Components (a machine-building plant) and the Brennholt Group (a six-company group), with generated data. Where a folder carries project instructions, such as the names of a database’s tables, the run used them, as a customer’s would. Names, keys and file paths of the machine that ran it are masked; nothing else on a screen is changed. No customer data appears.
More use cases.
All 9- Build an I/O list from the drawingsCard, channel, address and terminal read from three schematic sheets into the house Excel template, with every place the spec and the drawings disagree.
- Review a specification before the design reviewA functional specification checked against the schematics and the house coding guideline, written up as a review table, most severe first.
- Find what is holding a line backOne question across the MES, the maintenance system and the ERP: what is down, what work is open, and which part nobody has ordered.
Request pilot access.
Not a waitlist. Tell us the problem and we’ll tell you honestly whether seib is ready for it.
- 1A person reads your request and replies within a few business days.
- 2A short call about the line, the toolchain and what's slow today.
- 3A Cowork pilot starts with one team, read-only connectors and two or three knowledge bases.